A DN200 metal seated ball valve came off the blowdown line between a digester and the first flash tank after nine weeks in service. The body was sound. The bore was sound. The ball had a groove in it four millimetres deep and six millimetres wide, running right around the ball on the circle where the seat had been touching it, with edges sharp enough to catch a fingernail. The seat ring carried a matching step worn into its face. Everything in that valve that had not been in the narrow gap between ball and seat, including parts that had sat in the same liquor at the same temperature for the same nine weeks, was close to new.
The maintenance report called it erosion and asked for a harder ball. That is the natural reading and it is wrong in a way that costs a refinery a set of trim every two months for years, because a harder ball will also groove, only later. Almost nothing flowed across that ball. The valve was shut. What flowed was the small quantity of liquor that got past the seat, and it flowed through a gap measured in tenths of a millimetre at a velocity no pipe in the plant ever sees. The valve was not eroded by the process. It was machined by its own seat clearance, with the process acting as the cutting compound.
What follows is the arithmetic: what the digestion train actually contains, why isolation and letdown cannot share one body, how thirty bar of pressure becomes ninety volumes of flash, why the groove deepens itself once it exists, which of the six minerals in red mud does the cutting, and why the caustic that everyone blames is actually a cracking problem rather than a corrosion problem. It ends with six clauses that would have doubled the life of that valve, none of which is a material grade.
1. What a digestion train asks of a valve
A Bayer refinery is a caustic loop with a solids problem bolted to the front of it. Bauxite arrives with 45 to 60 percent alumina of which 30 to 40 points are extractable, 5 to 30 percent iron oxide, 1 to 10 percent silica and, in the ores that decide valve life, 0.5 to 3 percent quartz. It is ground to a median of 50 to 150 micrometres and mixed with spent liquor carrying 150 to 260 grams per litre of sodium hydroxide expressed as sodium oxide, at a solids loading of 30 to 40 percent by weight. The mixture is then held at temperature long enough for the alumina to dissolve, and the whole point of the exercise is that everything else does not.
The temperature is not a process choice so much as a property of the ore. Gibbsite dissolves readily and needs 140 to 150 degrees C, which is 4 to 6 bar of saturated steam. Boehmite needs 200 to 240 degrees C. Diaspore, which is what a refinery in China or Greece is usually built around, needs 240 to 280 degrees C at 30 to 45 bar. That single sentence explains why two refineries with identical flow sheets run valve populations that fail in completely different ways.
Stage | What is in the pipe | Conditions | What the valve has to survive |
|---|---|---|---|
Ground bauxite feed | dry ore, 50 to 150 micrometre | ambient, 1 to 3 bar | Attrition of the seat face by dry angular particles; no liquid to cushion anything |
Pre-desilication | slurry at 30 to 35 percent solids | 100 to 110 degrees C, 3 to 6 bar | Slow abrasion and heavy scaling, at velocities low enough that geometry wins |
Digestion, gibbsite ore | slurry, 200 g/L Na2O | 145 degrees C, 5 bar | Caustic cracking of the body, and scale on every hot surface |
Digestion, diaspore ore | slurry, 240 to 260 g/L Na2O | 240 to 260 degrees C, 32 to 45 bar | The same two, plus a thermal expansion problem across every flange |
Blowdown to flash | the same slurry, flashing | 34 bar in, 4 bar out, 241 to 144 degrees C | Two phase flow at the throat, and that is where the seat dies |
Spent liquor to evaporation | clear liquor, 180 to 200 g/L Na2O | 100 to 130 degrees C, 2 to 4 bar | Scale, and caustic cracking where the insulation stops |
Red mud washing and disposal | 35 to 50 percent solids, pH 12 to 13 | 60 to 90 degrees C, 1 to 3 bar | Wear on the ball, and settlement in every dead volume |
Read the fifth row twice, because it is the only row in the table where a valve is asked to remove thirty bar in one step, and it is also the row that gets specified by copying the row above it. A blowdown valve is bought on line size, flange pattern and body material, which are the three things that matter least.
2. Two duties that should never share one body
Isolation wants a full bore, a seat that seals dead tight, and a flow path with nothing in it to wear. Letdown wants a restricted passage, an expanded outlet, a hardened surface where the energy is dissipated, and above all a velocity ceiling. These are opposing requirements and a ball valve is unusually bad at satisfying both, because its bore is the largest in the plant when open and its seat gap is among the smallest when closed.
Take a 300 cubic metre per hour blowdown line in DN200. The bore area is 0.0314 square metres, so the pipe velocity is 2.65 metres per second, which is exactly where a 35 percent solids slurry should be run and is the reason the pipe lasts fifteen years. Now close the valve to the point where the flow passes a gap whose area is four percent of the bore. The same mass now crosses 0.00126 square metres at 66 metres per second. Nothing about the fluid changed. The valve did that.
At twenty five times the pipe velocity, each particle carries 625 times the kinetic energy, and erosive metal loss climbs steeply with speed, somewhere between the second and the third power of it depending on whether impact or cutting dominates. That is a factor of three thousand at one end and fifteen thousand at the other. This is why a blowdown trim can disappear in nine weeks in a line whose pipe has a fifteen year life, and why the maintenance department, looking at a pipe that is fine and a seat that is gone, concludes that the seat material must be wrong.
3. Thirty four bar to four, in ninety volumes
The blowdown is not a pressure drop in the ordinary sense. It is a flash. Saturated water at 34 bar absolute is at 241 degrees C with an enthalpy of 1037 kilojoules per kilogram. At 4 bar absolute the saturated liquid enthalpy is 604.7 and the latent heat is 2133.8. The fraction that has to boil to get from one state to the other is (1037 minus 604.7) divided by 2133.8, which is 0.20. One fifth of the water turns to steam in the time it takes to cross the seat, and it does so by taking heat out of the remaining four fifths, which is why the downstream temperature is 144 degrees C and not 241.
Now the volume. A kilogram of slurry at 35 percent solids, with solids at 3000 kilograms per cubic metre and liquor at 1150, occupies 0.00068 cubic metres. After the flash, 0.132 kilograms of steam at 0.4624 cubic metres per kilogram takes 0.061 cubic metres on its own, and with the residual liquor and the unchanged solids the mixture occupies 0.0616. The fluid has expanded ninety times, in a distance of a few millimetres, at the one place in the valve where the passage is narrowest.
That is the whole mechanism, and it has a practical consequence that is easy to state and hard to enforce: a ball valve can isolate this line, and it cannot let it down. If a ball valve must be used for letdown, three things have to be true. The pressure has to be broken at the outlet rather than at the seat, which means a cage or an angle body rather than a plain ball. The trim has to be tungsten carbide rather than hardfaced, because quartz is harder than Stellite. And the valve must never be operated below about 30 percent open, because below that the same flow passes a smaller gap at a higher velocity, and the wear rate rises faster than the flow falls.
4. The groove cannot be reached, and that is the point
Look again at where the wear is. It is not on the ball generally and not in the bore. It is an annulus exactly at the seat contact line, because that is the one place where the gap is at its minimum and the velocity at its maximum. Once a groove of 0.2 millimetres exists, the gap has widened by 0.2 millimetres, the leakage has risen roughly in proportion to the cube of the gap, more liquor flashes, the local velocity goes up, and the groove deepens faster. The wear is not a linear process with a rate. It is a feedback loop with a threshold.
The second half of the trap is geometric. A seat in a soft seated valve has 0.3 to 0.5 millimetres of compression available and a metal seat has perhaps 0.1 millimetres of elastic travel. A groove four millimetres deep is eight to forty times beyond anything the seat can follow. The valve does not leak because the seat is worn out in the sense of having lost its spring. It leaks because the sealing line has moved into a trench that the seat cannot enter.
And the wear does not spread out. A quarter turn ball valve has one travel of ninety degrees from stop to stop, so the ball presents the same two bands to the seat every time it closes. There is no indexing, no rotation of the contact patch, no distribution of damage around the sphere. Two bands, machined from both sides, for the whole life of the valve. Any design change that claims to improve slurry life by hardening the ball without addressing the fact that the same band takes every cycle is only moving the failure date.
5. Red mud is harder than the metal, and only one of six components matters
Red mud is not a substance, it is a residue, and its abrasiveness is decided by one minor constituent. The iron reports as hematite and goethite, the titanium as anatase, the silica as a desilication product and, in the fractions that were never dissolved, as quartz. Those five have hardnesses spanning a factor of four, and the metal has a hardness that sits below all of them.
Phase in the slurry, or metal in the valve | Vickers hardness | What it does at the seat line |
|---|---|---|
Gibbsite, the alumina being dissolved | 200 to 300 | Nothing; it is softer than the seat |
Goethite, FeOOH | 500 to 600 | Polishes the seat face and rounds the contact band |
Anatase and rutile, TiO2 | 600 to 800 | Cuts, slowly, and is present in every ore |
Hematite, Fe2O3 | 700 to 900 | Cuts; the main abrasive in most red muds |
Quartz, SiO2, 0.5 to 3 percent of the ore | 1000 to 1100 | Cuts tungsten carbide, given velocity and time |
316L body, ball and seat carrier | 150 to 200 | The material being cut, by a factor of four to six |
Stellite 6 hardfacing | 400 to 450 | Survives hematite, loses to quartz at blowdown velocity |
Tungsten carbide, 88 percent WC with cobalt binder | 1100 to 1400 | The only metallic option in the same class as quartz |
Two conclusions follow that contradict common purchasing practice. The first is that abrasion resistant stainless steel is a contradiction in terms here: a 316L seat is a quarter as hard as the hematite in the fluid it is sealing against, and no amount of chromium changes that. The second is that Stellite, the default answer for slurry trim in most of the industry, is still 600 Vickers below quartz; it works in coal and it works in ash, and it fails in a diaspore red mud that carries free silica.
Trim material | Velocity ceiling at 35 percent solids (m/s) | Why the ceiling is there |
|---|---|---|
Carbon steel body, uncoated | 2 to 3 | Uniform metal loss becomes visible wall thinning within a year |
316L, uncoated | 3 to 4 | Better corrosion, no better hardness; the limit is mechanical |
Duplex 2205 | 4 to 5 | Higher strength, marginally higher hardness, same wear family |
Stellite 6 overlay | 5 to 7 | Survives hematite, is cut by quartz above this |
Tungsten carbide coating, HVOF, 150 to 300 micrometre | 6 to 9 | Hard phase equals quartz; life set by the cobalt binder and the coating bond |
Solid tungsten carbide insert | 8 to 12 | No binder path to the substrate; brittle under thermal shock |
These ceilings assume a median particle near 100 micrometres and a loading at the high end of normal. They fall when the particles get coarser and they rise, surprisingly, when the loading goes up further, because a dense slurry cushions its own impacts and the particles begin hitting each other rather than the wall. A plant that thickens its feed to debottleneck the clarifier therefore does not see the wear double, and a plant that dilutes to improve settling does not see it halve. Wear is not proportional to tonnes.
6. Caustic does not eat the body, it cracks it
The general corrosion rate of carbon steel in Bayer process liquor is low, of the order of 0.05 to 0.2 millimetres a year, because the caustic passivates iron as magnetite and the liquor is essentially free of oxygen. A 25 millimetre body wall losing a tenth of a millimetre a year is not a problem, and that is the reason carbon steel is the right choice for digestion vessels, flash tanks and most of the piping in a refinery. Reading only the corrosion rate, a carbon steel valve body looks safe for a century.
Caustic stress corrosion cracking is a different failure and it does not appear in a corrosion rate. Carbon steel cracks intergranularly in sodium hydroxide above roughly 5 to 10 percent concentration and above 50 to 60 degrees C, provided there is tensile stress at the surface and the caustic is concentrated at that surface. Spent liquor at 200 grams per litre of sodium oxide is about 20 percent sodium hydroxide by weight, and the digestion train runs at 145 to 260 degrees C. Every wetted carbon steel surface in the train is inside the cracking window; the only variables are stress and concentration.
Concentration is the one that catches people out, because it happens in places nobody instruments. A flange that weeps, an insulated body whose lagging has been wetted and dried a hundred times, a gland area where liquor evaporates between strokes, all concentrate sodium hydroxide towards 50 percent and above, and all raise the cracking susceptibility by an order of magnitude without raising the bulk concentration at all. This is the same mechanism that cracked riveted boiler seams in the nineteenth century, and the countermeasure has not changed: remove the stress rather than the caustic.
In practice that means post weld heat treatment of the body at 620 to 650 degrees C after every weld, including repairs done in the field, with a furnace chart in the documentation package rather than a certificate that says stress relieved. It means no cold formed bends, no welds ground flush and left in tension, and no hard stamping on a pressure boundary. It also means that duplex is not the answer: the ferrite phase is selectively attacked in hot concentrated caustic, and 2205 at 200 degrees C in 20 percent sodium hydroxide is a worse choice than stress relieved carbon steel. Where the concentration and temperature both go up, the reference material is nickel 200, at the cost of half the strength and all of the price advantage.
7. Scale grows where the heat is, and the seat is the hottest cold spot
The liquor leaving digestion is supersaturated in silica and in sodium aluminate, and it deposits a desilication product, a sodalite family scale, on hot surfaces at rates from 0.1 to 1 millimetre a month depending on the silica load and the temperature. The scale is not removed by acid, only by hot caustic wash or by mechanical means, and its thermal conductivity is around 1.5 watts per metre kelvin against 45 for steel, so a two millimetre layer behaves like thirty millimetres of wall as far as heat transfer is concerned.
That matters to a valve for one reason. Scale does not grow evenly, and it does not grow at all on a surface that is being wiped. The ball wipes a band twice per cycle. The seat ring face and the cavity behind it do not get wiped, so the scale builds preferentially on the stationary part, the seat contact becomes a scale on metal contact rather than metal on metal, and the valve begins to leak at a few tenths of a millimetre of lift. From there the mechanism is the one described earlier: leak, flash, velocity, groove. Scale is not a fouling nuisance that reduces Cv. In this service it is the trigger for the wear that everyone then blames on the abrasive.
8. Six clauses that would have doubled the life of that valve
Name the duty, and allow only one. Isolation or letdown, in the datasheet, with a line that says the valve will not be used for the other. Every blowdown valve in a refinery has been used for both.
Set the velocity ceiling at the worst case, not the nominal. The number that governs is at minimum controllable flow and maximum solids, in metres per second at the seat gap, not cubic metres per hour on the line.
Specify hardness in Vickers with the phase named. Tungsten carbide 1100 to 1400 HV with the binder percentage stated, or Stellite 6 at 400 to 450 HV with an acceptance that it will not survive free quartz. A drawing that says hardfaced is a drawing that says nothing.
Require a flush connection at the lowest point of the cavity, one inch minimum, with the flush pressure and the flow rate stated, and a note that the connection must be rodded out at every shutdown because a 60 percent solids sediment will plug it in one outage.
Require post weld heat treatment after all welding, at 620 to 650 degrees C, with the chart, and a hardness survey of the heat affected zone on the certificate.
Quote torque at the end of the specified interval, with the deposit allowance named. A DN200 class 300 valve that turns on 1500 newton metres when clean will demand 4500 to 7000 with a scaled seat and a settled cavity, and an actuator sized on the clean figure will stall in the second year and be diagnosed as an instrument fault.
9. Where J-VALVES fits
The arguments in this article are all settled on paper, and the paper needs three numbers on it: the differential, the temperature and the solids. J-VALVES builds the bodies, balls and seat carriers that those three numbers describe, and issues the torque curve measured at the differential the order names rather than a single figure taken in air at ambient. The catalogue covers bores from DN15 to DN1400, a half inch to 56 inches, in ASME classes 150 through 2500, across 846 kelvin of temperature from 196 below zero to 650 above it. Shells are taken to 150 percent of rating before dispatch and seats to 110 percent, and the two certificates are separate documents, each recording the side the pressure was applied from. An enquiry that states the differential, the solids loading and the seat material comes back as a priced drawing inside three working hours, and it will say which of the six clauses above the standard design already meets.
10. The one line to remember
A ball valve in a Bayer plant is not eaten by the caustic and it is not worn out by the mud. It is machined by its own seat clearance, at a velocity created by a flash that only happens because the valve is nearly closed, and it does that to itself on the same two bands of the same ball for as long as it is in service.
11. Frequently Asked Questions
Can a 316L ball valve be used on red mud service?
It can be installed and it will not corrode quickly, because the liquor passivates stainless steel and the corrosion rate is low. It will wear out, because 316L runs at 150 to 200 Vickers and the hematite in the mud is 700 to 900 and the quartz is 1000 to 1100. A 316L seat is being cut by an abrasive four to six times harder than itself, so the only question is how many weeks it lasts. If the line is an isolation valve at 2 metres per second it may last years; if it is a blowdown at 66 metres per second at the seat gap it will not last a quarter.
What velocity should a red mud slurry be limited to through a ball valve?
Between 2 and 3 metres per second for carbon steel, 3 to 4 for 316L, 5 to 7 with Stellite hardfacing and 6 to 9 with tungsten carbide, at a median particle near 100 micrometres and 35 percent solids. Those figures apply to the velocity at the narrowest passage, which in a ball valve is the seat gap and not the bore. A DN200 line running 300 cubic metres per hour has a bore velocity of 2.65 metres per second and a seat gap velocity above 60, and it is the second number that sets the life.
Why is caustic stress corrosion cracking more important than corrosion in a Bayer plant?
Because the uniform corrosion rate is negligible and the cracking is not. Carbon steel loses 0.05 to 0.2 millimetres a year in Bayer liquor, which is a century of life on a 25 millimetre wall, but it cracks intergranularly in sodium hydroxide above about 5 to 10 percent and above 50 to 60 degrees C when there is tensile stress. Spent liquor at 200 grams per litre of sodium oxide is roughly 20 percent sodium hydroxide, so the whole train is inside the window and the only defence is post weld heat treatment at 620 to 650 degrees C and the avoidance of concentrated caustic at wetted insulation and weeping flanges.
Should the digestion blowdown be a ball valve at all?
Not for continuous letdown. A 34 bar to 4 bar flash expands the fluid about ninety times at the seat, drives the throat velocity to 60 metres per second and above, and puts the entire pressure drop across the one surface that must also seal. A cage trim, an angle body or a dedicated letdown device with an expanded outlet will last longer for the same alloy. A ball valve is the right choice upstream and downstream of that device, where the job is isolation and the velocity is the pipe velocity.
What seat leakage class is achievable with a metal seat in this service?
ISO 5208 rate D, and it should be written into the specification as rate D with the test fluid named, because rate A on a bench with clean water is achievable and rate A in service is not. The reason is arithmetic rather than workmanship: a metal seat has about 0.1 millimetres of elastic travel, and the first groove that forms at the contact band is deeper than that within weeks. A specification that asks for rate A and receives a certificate for rate A has bought a bench result, and the first month of operation will convert it into a rate D valve with a groove in it.